Morgan Sindall vs Kier Group

Side by side on construction companies — the attributes that change the outcome, and nothing else.

The short answer

Morgan Sindall and Kier Group both score 57/100 on our weighted model for construction companies, with Morgan Sindall ahead on insurance cover and client score.

Kier Group lists at £450/day, £20 less than Morgan Sindall.

Choose Morgan Sindall if insurance cover and client score matter more to you.

Choose Kier Group if day rate from and lead time matter more to you.

Morgan Sindall

Commercial fit-out

57

£470/day

Visit site
Kier Group

Regional building works

57

£450/day

Visit site
AttributeMorgan SindallKier Group
Day rate from£470£450
Minimum contract£100,000£50,000
Insurance cover15 £m10 £m
Accreditations66
Lead time9 weeks8 weeks
SectorsCommercialResidential
Client score4.2 /54.1 /5
Score5757

Bold marks the stronger value. 1 attribute is level.

The score is not a verdict on either company. It normalises each attribute across the construction companies shortlist, weights it by how much it changes the outcome, and scales the result to 100 — so a provider can win on score while losing on the one thing you care about. Check the row that matters to you, then read the terms on the provider's own site before signing.

Other construction companies comparisons

Is Morgan Sindall cheaper than Kier Group?

Kier Group lists at £450/day, £20 less than Morgan Sindall. Both are indicative figures — confirm the final quote with each provider.

Which scores better, Morgan Sindall or Kier Group?

Morgan Sindall and Kier Group both score 57/100 on our weighted model for construction companies, so the ranking does not separate them.

Where does Morgan Sindall beat Kier Group?

Morgan Sindall leads on insurance cover and client score. The weighting reflects how much each attribute changes the outcome, not a general verdict on either provider.

Where does Kier Group beat Morgan Sindall?

Kier Group leads on day rate from, lead time and minimum contract. The remaining attributes are level or favour Morgan Sindall.

How is the score calculated?

Each attribute is normalised across the construction companies shortlist, multiplied by its weight — day rate from 3, insurance cover 2, accreditations 2 — and scaled to 100. Every weight is editable, so the ranking can be explained line by line rather than asserted.