Balfour Beatty vs Morgan Sindall

Side by side on construction companies — the attributes that change the outcome, and nothing else.

The short answer

Morgan Sindall scores 57/100 against 33/100 for Balfour Beatty on our weighted model for construction companies, with Morgan Sindall ahead on day rate from, lead time, client score and minimum contract.

Morgan Sindall lists at £470/day, £50 less than Balfour Beatty.

Choose Balfour Beatty if insurance cover and accreditations matter more to you.

Choose Morgan Sindall if day rate from and lead time matter more to you.

Balfour Beatty

Infrastructure works

33

£520/day

Visit site
Morgan Sindall

Commercial fit-out

57

£470/day

Visit site
AttributeBalfour BeattyMorgan Sindall
Day rate from£520£470
Minimum contract£250,000£100,000
Insurance cover25 £m15 £m
Accreditations76
Lead time12 weeks9 weeks
SectorsInfrastructureCommercial
Client score4 /54.2 /5
Score3357

Bold marks the stronger value.

The score is not a verdict on either company. It normalises each attribute across the construction companies shortlist, weights it by how much it changes the outcome, and scales the result to 100 — so a provider can win on score while losing on the one thing you care about. Check the row that matters to you, then read the terms on the provider's own site before signing.

Other construction companies comparisons

Is Balfour Beatty cheaper than Morgan Sindall?

Morgan Sindall lists at £470/day, £50 less than Balfour Beatty. Both are indicative figures — confirm the final quote with each provider.

Which scores better, Balfour Beatty or Morgan Sindall?

Balfour Beatty scores 33/100 and Morgan Sindall scores 57/100 on our weighted model for construction companies. Morgan Sindall leads by 24 points.

Where does Balfour Beatty beat Morgan Sindall?

Balfour Beatty leads on insurance cover and accreditations. The weighting reflects how much each attribute changes the outcome, not a general verdict on either provider.

Where does Morgan Sindall beat Balfour Beatty?

Morgan Sindall leads on day rate from, lead time, client score and minimum contract. The remaining attributes are level or favour Balfour Beatty.

How is the score calculated?

Each attribute is normalised across the construction companies shortlist, multiplied by its weight — day rate from 3, insurance cover 2, accreditations 2 — and scaled to 100. Every weight is editable, so the ranking can be explained line by line rather than asserted.