Balfour Beatty

Construction companies

Infrastructure works

Infrastructure works — indicative figures, verify with the provider.

  • Major infrastructure
  • Bonding capacity
  • National coverage

The numbers

Day rate from
£520
Minimum contract
£250,000
Insurance cover
25 £m
Accreditations
7
Lead time
12 weeks
Sectors
Infrastructure
Client score
4 /5

Source: seed · status: indicative. Confirm the final quote with Balfour Beatty.

Why this scores 33

Each attribute is normalised against every offer in construction companies (0 = worst in the market, 1 = best), flipped where lower is better, then multiplied by its weight. Points ÷ total weight × 100 is the score.

AttributeThis offerNormalisedWeightPoints
Day rate from5200.0030.00
Minimum contract2500000.0010.00
Insurance cover251.0022.00
Accreditations71.0022.00
Lead time120.0020.00
Client score40.0020.00
Total124.00

Compare with